Camel Hill Quarry
IndustrialInert
Camel Hill Quarry is a historic (closed) landfill site recorded by the Environment Agency near Castle Cary, Somerset. It received industrial and inert waste between 1989 and 1992, covering about 1.35 hectares. Reference EAHLD08575, October 2025 data revision.
Full record
| EA reference | EAHLD08575 |
|---|---|
| Site name | Camel Hill Quarry |
| Address | Queen Camel, Sparkford |
| Site operator | Not recorded |
| Licence holder | L A Moore Limited |
| Licence issued | 15 November 1989 |
| Licence surrendered | 18 February 1993 |
| First waste input | 29 November 1989 |
| Last waste input | 5 June 1992 |
| Area | 1.35 ha |
| Gas control | Not recorded |
| Leachate containment | Not recorded |
| Licensed site | Yes |
| EA area | North Wessex SW |
| Grid reference | 359600, 125500 |
Source: Environment Agency Historic Landfill Sites dataset, October 2025 revision.
Boundary map
What these waste types mean
- Industrial:
- factory and process waste. Contents vary widely — some benign, some not; the site's operator and era are the clues.
- Inert:
- builder's rubble, subsoil, concrete, brick. Doesn't decompose or generate gas; the lowest-concern category.
Other historic landfill sites nearby
- Sparkford Refuse TipCommercial
- Land Adjacent to Hazlegrove ParkHouseholdInert
What this data does — and doesn't — cover
- Licensed-era records only. Waste licensing began in 1974. Older tips — especially small pre-war ones — are incompletely recorded, so absence from this data does not mean no landfill ever existed here.
- Not the contaminated-land register. Councils hold a separate register of land determined as contaminated. A historic landfill entry is not a contamination determination, and vice versa.
- Boundaries are indicative. Digitised at 1:10,000 scale; some are buffers around a point rather than surveyed edges.
- Not a substitute for a formal environmental search. If you're buying, your conveyancer's environmental search checks this and several other sources.
EA Historic Landfill dataset, October 2025 revision. More on the methodology page.